The Victoria to New South Wales Interconnector West (VNI West) project, is proposed to provide a link in the electricity transmission system between the Murray River and Western Victoria Renewable Energy Zones (REZs) in both Victoria and New South Wales (NSW) and load centres in those jurisdictions to strengthen the connection between power grids in NSW and Victoria.

The proposed project for assessment in the environment effects statement (EES) comprises the Victorian component of VNI West. This includes the construction of a new 500 kV double-circuit electricity transmission line and associated infrastructure situated within Victoria including a proposed terminal station in Tragowel. The transmission line is proposed to be located in the area between the proposed Western Renewables Link terminal station in Bulgana (this terminal station is not part of the VNI West scope) and the Murray River north of Kerang (at the Victoria and NSW border), to connect to the NSW portion of VNI West.

Process

Scoping requirements

The scoping requirements set out the matters to be investigated and documented in the EES.

Draft scoping requirements for this EES have been prepared and will be on exhibition at Engage Victoria for a period of 15 business days between 28 November and 18 December 2024.

After considering public submissions on the draft scoping requirements, the Minister for Planning will issue the final scoping requirements, which will be uploaded to this page.

Consultation plan

Transmission Company Victoria has prepared a consultation plan for the EES, outlining the opportunities and approaches for community engagement during the preparation of the EES. The plan may be updated as required during the preparation of the EES. If the plan changes, the updated version will be posted on this page.

Technical Reference Group

The department has convened an inter-agency Technical Reference Group at the request of the Minister for Planning to advise the department and the proponent on scoping and adequacy of the EES studies and documentation, as well as co-ordination of the EES process with other statutory processes for the project.

The organisations represented on the Technical Reference group are:

  • Department of Transport and Planning (DTP) - Impact Assessment
  • Department of Energy, Environment and Climate Action (DEECA) – Planning and Environment Assessment
  • DTP Planning
  • Buloke Shire Council
  • Gannawarra Shire Council
  • Loddon Shire Council
  • Northern Grampians Shire Council
  • EPA Victoria
  • Goulburn Murray Water
  • North Central Catchment Management Authority
  • First Peoples - State Relations
  • Barengi Gadjin Land Council Aboriginal Corporation
  • Dja Dja Wurrung Clans Aboriginal Corporation
  • Heritage Victoria
  • Agriculture Victoria
  • Country Fire Authority
  • Vic Grid.

Technical Reference Group representatives are supported by technical experts on specific aspects of the EES studies.

Minister’s decision on referral

On 13 April 2024 the Minister for Planning required Transmission Company Victoria to prepare an environment effects statement (EES) under the Environment Effects Act 1978 to assess the potential environmental effects of the project.

Referral decision (reasons and statement of decision) is on project page.

More information

If you have any questions or feedback, please get in touch via the contact details below.

Proposed Victoria to New South Wales Interconnector West project queries:

Transmission Company Victoria

Phone: 1800 824 221
Email: enquiries@transmissionvictoria.com.au
Website: https://www.transmissionvictoria.com.au

EES process queries:

Impact Assessment Unit

Phone: (03) 8622 7633
Email: environment.assessment@transport.vic.gov.au

Page last updated: 02/12/24